burlingtongazette.ca
New surgery equipment being installed as hospital re-build stays on target – roads outside a total mess.
By Staff July 18th, 2106 BURLINGTON, ON Construction of the patient tower is moving along nicely. The last window on Level 7 of the new patient tower was installed at the end of June! Soon, two ele…