May 18th, 2024
BURLINGTON, ON
In time for the Victoria Day long weekend, the City’s nine splashpads will be open by Saturday, May 18. The splash pads will stay open until the fall.
The Nelson Outdoor Splash Park will offer designated free times during the pre-season schedule. The pool will be unavailable during these sessions.
Splash pads are located throughout the city and are free to use. To find a splash pad near you, visit burlington.ca/splashpads.
Outdoor Pools
Outdoor Pools will be opening earlier this summer.
- Nelson Pool and Splash Park (4235 New St.) will open May 25.
- Mountainside Pool and Splash Park (2205 Mount Forest Dr.) will open June 8.
- LaSalle Wading Pool (50 North Shore Blvd.) will open June 15.
The City of Burlington will offer a modified drop-in swim schedule at outdoor facilities between May 25 and June 29, with summer schedules beginning June 29.
Stay informed by checking out our schedule online, which will be fully available for viewing starting May 22 at burlington.ca/dropinandplay.