Two lanes of the QEW Niagara Bound Skyway Bridge will be closed TONIGHT AT 10 PM

By Gazette Staff

August 8th, 2025

BURLINGTON,

 

The Ministry of Transportation (MTO) will be closing two lanes of the QEW Niagara Bound from Friday, Aug. 8 at 10 p.m. until Monday, Aug. 11 at 5 a.m.

During this time, all ramps from the Eastport Drive Collector to the Skyway Bridge will be closed.

Burlington Skyway Bridge Closure

As part of our project on the QEW/Burlington Bay Skyway Bridge (Niagara Bound), the contractor is working on the rehabilitation of the QEW Niagara Bound lanes of the Burlington Bay Skyway bridge and will be closing 2 (two) Niagara Bound (Eastbound) lanes (out of 4 existing lanes) for bridge deck rehabilitation.

Specifically:

  • 2 (two) lanes out of 4 existing, on the QEW Niagara Bound will be closed from 10:00pm Friday August 8, until 5:00am Monday August 11, weather dependent.
  • Within the weekend lane closures, the QEW approaching the bridge will be fully closed on:
      • Saturday morning, August 9 at 1am to 3am.
      • Monday morning, August 11 at 1am to 4am.

Advance signing and notification will be provided to motorists so they can plan an alternate route.

 

Return to the Front page

Comments are closed.