Canal bridge closed until late March

By Staff

January 3rd, 2024

BURLINGTON, ON

 

The Burlington Canal Lift Bridge will close Jan. 2 to all car, bike and walking traffic and is not expected to reopen until late March.

The closure will allow ongoing rehabilitation of the bridge, which lifts to allow shipping traffic into the harbour and also provides a road link across the canal between Hamilton’s beach strip and Burlington.

Typical day at the Canal that separates Burlington from Hamilton

The latest $21-million overhaul is meant to extend the life of the lift bridge for decades, with major work including replacement of the bridge deck.

The bridge is supposed to reopen March 20, a few days before the 2024 edition of the Around the Bay road race that runs along the waterfront.

The race is slated for March 24.

Return to the Front page
Print Friendly, PDF & Email

Comments are closed.