By Staff
July 8th, 2022
BURLINGTON, ON
The bridge work on Walkers Line between Britannia Road and Derry Road will continue, resulting in a road closure July 18 – 22, 2022.

A leisurely country drive through Escarpment country will be disrupted – Road closures.
From July 25 to 29, the roadway will be reduced to one lane when workers are on site and controlled with Traffic Protection Flagmen.
The work will include alignment changes, asphalt renewal, guide rail replacement (east side) and streetlight improvements.
The new bridge will meet the high water demands from heavy rainfall events and will be constructed with an upgraded traffic barrier and railings. The bridge width will be 1.5m wider on both sides.
