By Pepper Parr
April, 4th, 2022
BURLINGTON, ON
A first look at the rendering below leads to the questions: Isn’t that the Burlington GO parking lot?
It is and at one point Metrolinx had evaluations one on all their properties to determine what their development options were.
We don’t believe this is part of the current Metrolinx thinking. It will be interesting to learn when they were doing the thinking and what happened once the values had been determined.
There are a lot of high rise structures on the property.
Was this before intensification was dropped on Burlington?