By Staff
July 23, 2017
BURLINGTON, ON
The Burlington Canal Lift Bridge will be closed in the evenings to vehicular and pedestrian traffic in both directions between 8 pm and 5 am from Monday, July 24, to the morning of Saturday, July 29
Marine traffic will not be affected.
The closures are required as part of the project to replace the bridge’s controls, drives and cables.