By Staff
May 1st, 2018
BURLINGTON, ON
Work by the Ontario Ministry of Transportation (MTO) to rehabilitate the Burlington Skyway Bridge will result in a closure of all Toronto-bound QEW/Skyway Bridge lanes on Saturday, May 5 and Saturday, May 12.
QEW Niagara-bound traffic will not be affected by the construction.
Closure Details:
Saturday, May 5, 2018
Beginning at 9 p.m., all Toronto-bound QEW/Skyway Bridge lanes will be closed.
All traffic will be detoured onto Eastport Drive.
This full lane closure will remain in effect until Sunday, May 6, 2018 at 10 a.m. All lanes will reopen by 2 p.m.
Saturday, May 12, 2018
Beginning at 9 p.m., all Toronto-bound QEW/Skyway Bridge lanes will be closed.
All traffic will be detoured onto Eastport Drive.
This full lane closure will remain in effect until Sunday, May 13, 2018 at 10 a.m. All lanes will reopen by 2 p.m.
Traffic Detour:
To help assist the flow of traffic on Eastport Drive during the full lane closures, access to Beach Boulevard from Van Wagners Beach Road and Eastport Drive will be restricted to local traffic only. Police officers will be posted at these locations to assist with traffic control.