Burlington condo prices are up - sales down slightly, inventory remains low

By Staff

April 9th, 2022

BURLINGTON, ON

The Baxter was a very successful condo development; seen as a prime location and an attractive building to boot. The proposed structure for Brock and Elgin is anything but attractive if the drawings are any indication of what they want to build.

The Baxter was a very successful condo development; seen as a prime location. 

During the month of March, the average price for a condo apartment in Burlington was $797,000, 37.2% higher than March 2021 when we saw the average price at $581,000 and up slightly from last month $775,000.

The price per square foot was up in March at $791, compared to $640 the same month last year. In March, properties sold for just over 111% of the listed price, down from 116% last month and on par with last month in 8 days.

Sales were slightly down 4.4% as compared to March 2021 and up slightly from last month.

The condo market is a bit of a different beast, condo investors are still strong and although as markets start to shift we tend to see it first in properties like condos, inventory levels remain low and the market is still performing strong.

 

Return to the Front page

Home Opener: The Jays bring it home at the Rogers Centre; beat Texas Rangers 10-8

By Denis Gibbons

April 9th, 2022

BURLINGTON, ON

 

The boys of summer were getting ready to play their season opener in a ballpark they had not played in for close to two years.

The crowd in the stadium was expected to top 50,000 people.

And the fans were pumped.

Anything less than a win, a big win was going to be seen as a bummer.

I interviewed nine Burlingtonians at the GO station to get their take on the game they were going to watch.

Interesting bit of information – a lot of the people I interviewed were from the Niagara region – I thought they would have boarded the GO train at Aldershot.

Nolan and Elliott Jackson

Nolan Jackson, 16, (left) and brother Elliott, 12, had tickets for Opening Day of 2021, but couldn’t make it because the Blue Jays had to open in Florida during the pandemic. They didn’t miss this one, though.

Nolan, a middle infielder with the Oakville-based Ontario Royals, said the Jays have a lot of young talent like Bo Bichette and Chapman. “But pitching could be their weakness,” he said. “They need to strengthen their bullpen.”

Barb Parsons

Attending her 10th Opening Day game, Barb Parsons said Toronto’s chances are very good this year, barring injuries. “They have a lot of talent and good chemistry,” she said. Although it was her 10th opener, it was her first Blue Jays game in 12 years. That was before her husband passed away.

Jo Savelli

A public health nurse in Hamilton, Burlington’s Jo Savelli set an excellent example by wearing her Blue Jays mask as she waited for the GO train. As a 14-year-old, Savelli watched the team’s major league debut in the snow on TV in 1977.

Later that year she was a member of a Burlington team that won the Provincial Women’s Softball Association championship in its age group. What did she pay for her ticket? “$145, but I’m right behind home plate, five rows up. And it pays for all the vacations I’m not taking!” she said.

Ian and Liam MacRae

Eleven-year-old Liam McRae, a second basemen with the Burlington Bulls minor peewee team, attended his first Opening Day with his father Ian, who has his own construction company Your Life Outside.

The father-son duo have been to spring training games in Dunedin, Florida, but were looking forward to seeing a healthy George Springer leading off for the Blue Jays. What impresses the Central elementary school student about Springer? “He’s really good at his position and he smiles a lot!”

Tyler Maskell

A last-minute ticket worth $140 landed Tyler Maskell, 26, in a seat a field level near home plate. On his first Opening Day ever, Maskell was anxious for his first peek at the Blue Jays newly acquired third baseman Matt Chapman.

“He should put us over the top,” said Maskell, who also was lucky enough to be a spectator at the Blue Jays first game back in Toronto last July when they took the field at Rogers Centre for the first time in 670 days storming out of a tunnel, smoke shooting into the air behind them as the home crowd roared. They ran as a team towards the infield, their path lined on each side by 100 healthcare workers waving Blue Jays flags.

The Jesus Family

It was the second Opening Day visit for Burlington’s Trish Jesus, who made the trip with her husband Josh and sons Jeffrey, 10, and Darryl, 7. The family created these colorful signs at home.

“We’re in the nosebleeds,” Trish said. But that afforded the boys a perfect view of their favorite player George Springer in centre field. Josh, who has taken in three or four openers, said the best was the year the family had free tickets in a private box. “That’s when Bautista and Encarnacion were playing,” he said.

John Droughan

A condo superintendent, 33-year-old John Droughan -paid $60 for 200 Level seats in the outfield on his first Opening Day. “It’s exciting,” Droughan said. “With Vladdy and Bo, it’s going to be an electric offence. As long as our pitching holds up, we’ll have a good year. Droughan’s fondest memory was attending a playoff game against Texas during the Blue Jays long playoff run in 2015, which ended with Toronto losing to the Kansas City Royals in Game 6 of the American League championship series.

Dayna Naim

A student at Mohawk College in Hamilton, Dayna Nairn has a huge affection for Bo Bichette and she’s not afraid to show it, as the photo indicates. “He’s my age and he’s a shortstop like I was when I played,” Nairn said.

Nairn bought a ticket online for her initial Opening Day. “The Jays spent a lot of money during the off-season, I think their chances are very good.”

Doug McKillop and his daughter Ashleigh

Doug McKillop’s father Lionel was in the stands at Exhibition Stadium in April of 1977 when the Blue Jays made their major league debut in the snow. He still has the ticket stub. Friday he took in his 15th Opening Day with daughter Ashleigh, who has been to seven or eight herself.

“There’s no excuse why they can’t get to the World Series,” Doug said. “They just have to stay healthy.

The first three innings were not good for the Jay – from that point on they took control of the game and ended up winning the season opener against the Texas Rangers 10-8.  The fans on the GO trains going home were happy campers.

Every seat in the ball park had a team cap on the seat. Keep sake for sure.

Return to the Front page

There are solid reasons to be concerned about the Covid19 testing the government is not doing

By Staff

April 8th, 2022

BURLINGTON, ON

 

The Beachway water treatment plant in Burlington is the largest in the Region

The Covid19 infection numbers for the province are not encouraging – infection reports are climbing and the number of children not in school is alarming.

The Boards of Education don’t have any central reporting – what we are hearing from readers is that – a lot of kids are not in class.

With province wide reporting gone for now municipalities are relying on waste water testing.

While the numbers are not high – the trend is in the wrong direction

 

Location of the waste water treatment plans where testing is done. The test results are rising in every location

Return to the Front page

Average price for freehold properties in March was a million and a half dollars.

By Staff

April 8th, 2022

BURLINGTON, ON

 

Yesterday we got the federal budget that promises all kinds of money for housing people can afford and a tightening of the rules that will govern real estate speculators.

Today we get to look at what life is really like in the Burlington real estate market.

From the Rocca Sisters:
During the month of March, the average price for a freehold property in Burlington was $1,510,482, 17.3% higher than March 2021 when we saw the average price at $1,288,129 and slightly down from the average price of $1,626,700 last month.

During the month of March, properties sold for 116% of the listed price down from 124% last month and in 6 days, on average, on par with last month.
Sales were still down 23.8% as compared to March 2021.

Inventory levels, although still historically low, have increased substantially over the last month. The market started to shift slightly mid-late February and we continue to see the transition day to day.

Return to the Front page

Robbery Investigation in Burlington - bandits threaten to taser anyone who gets in their way

By Staff

April 7th, 2022

BURLINGTON, ON

 

The Halton Regional Police Service (HRPS) 3 District Criminal Investigations Bureau is investigating a robbery that took place at the Burlington Mall (located at 777 Guelph Line).

On April 6, 2022, at approximately 8:00 pm, three suspects entered the Rogers Wireless retail location inside the Burlington Mall and demanded cell phones while one suspect displayed a Conducted Energy Weapon (commonly referred to as a Taser).

This is ugly – these men were prepared to hurt people.

The suspects loaded garbage bags with approximately $200, 000 worth of phones and fled in a waiting vehicle driven by a fourth suspect.

The vehicle is a 2019 white Kia Sedona with Ontario licence plate CJWL 247. The vehicle was reported stolen out of York region.

No physical injuries to employees were reported to police.

Suspect 1: Male, black, with a slim build. He was wearing a black pullover hooded sweater with vertical white panel with the word “Reckless” embroidered on it. Also wearing a black baseball hat and white shoes.

Suspect 2: Male, black, with a slim build. He was wearing a black full zip hooded sweater with black track pants and white sunning shoes.

Suspect 3: Male, black, with a medium build. He was wearing a grey full zip hooded sweater with black pants and black high-top sneakers.

Anyone with information regarding this investigation is asked to contact the 3 District Criminal Investigations Bureau at 905-825-4777 ext. 2316.

Tips can also be submitted anonymously to Crime Stoppers. “See something? Hear something? Know something? Contact Crime Stoppers” at 1-800-222-8477 (TIPS) or through the web at www.haltoncrimestoppers.ca.

Media Inquiries:

Return to the Front page

One of the best restaurateurs in the city appears to be prepping for a return - this time as Emmas Kitchen

By Pepper Parr

April 7th, 2022

BURLINGTON, ON

 

Most people are aware of the financial hit the hospitality sector has taken as a result of the pandemic.

The deep thinkers at the Economic Development Corporation and the leadership at the Burlington Restaurant Association believe it is going to take between 18 and 24 months for some to recover.

Those that had to take on a load of debt are going to need as much as three to five years to fully recover.

Craig Kowalchuk – on the way to a come-back?

One restaurant operate appears to be positioning himself for a new launch.

Craig Kowalchuk who operated Emmas Back Porch – very successfully for years has a new brand name on his T shirt.

Kowalchuk took the position that the pandemic was going to last a long time and renting space that he could not use due to closures was just not good business.

He put the corporation into bankruptcy and gave the landlord the keys.

The landlord gussied up the place a bit and does some private rentals.

When the conditions are right – look for Kowalchuk to appear in a new location- unless of course the owner of the property sees wisdom in welcoming back his former tenant.

It was the best spot for a brew and a decent meal – out on the patio overlooking the lake.. It will re-open at some point – under whose operation – no one is certain at this point.

Return to the Front page

Changing the way people view what has been a taboo subject - two women from Burlington appear to have made it happen

By Pepper Parr

April 5th, 2022

BURLINGTON, ON

 

How does change come about?

What makes people decide they want to change something that they think could be better.

Olivia Netto

Olivia Netto and Inman Nemar were both students at Nelson high school out riding their bikes and a situation arose that had them talking about those occasions when you really need a product there is nothing at hand.

The product in this instance was feminine personal hygiene products – a taboo for many people and something that young men just don’t know all that much about and are not comfortable asking questions either.  But for Olivia Netto and Inman Nemar it was a serious subject and they decided they wanted to try and bring about a change:  Getting free mental products in as many public locations as possible.

“Over the course of the past few years, we’ve noticed a lack of accessibility to feminine hygiene products both within the community and at schools. Our mission is to create a donation-based drive to cater to those in need. At school, in the workplace and in Burlington”, said Inman.

They took the view that offering free menstrual hygiene products in public washrooms is now considered as essential to the community as offering toilet paper, soap and paper towels.

Inman Nemar

Providing menstrual hygiene products in each of the public washrooms in the facility also provides a more inclusive approach to support the needs of transgender and non-binary individuals.

When they decided to try and involve the city they got a very good response.

Their focus was on Burlington – given the success they have had – they have their eyes on the Region, then the province and – why not the whole country.

They researched, they asked questions and they put together a presentation that went before city council.

They wanted the city to consider a pilot program

Olivia is studying Industrial design at Carlton University and Inman is studying Life Sciences at McMaster.

Asked how they can monitor the distribution and the take up Oliva said: “We have scouts out there.”

Why the apple? That’s something they will have to tell you. What they really want to talk about is their Pink Project.

There initiative is called the Pink Project; it was enthusiastically taken up by council – they approved the project as a pilot that will be in place until the end of the year.

Public response so far has been positive

Return to the Front page

Going to the Opener? Check the GO service changes

By Staff

April 5th, 2022

BURLINGTON, ON

 

The Blue Jays season will start on Friday night, April 8, at the Rogers Centre.

Metrolinx advises that both GO Transit and UP Express recently added more service. Though fans planning to take the Lakeshore West line to Sunday’s game (April 10) should be aware of construction that will limit train service. Metrolinx News has the latest guidance for getting to the game.
Opening night is always a big occasion for baseball fans and Friday’s game (April 8) will be even more special. The Rogers Centre will be open to full capacity for the first time

Been a while since we say those stands full. Photo by Mike Winterburn,

Improvements, which have been in place since Saturday, include 30-minute service or better – evenings and weekends too – on the Lakeshore West and Lakeshore

Going UP from Union Station
Additional UP Express trips have riders prepared for extra innings, with the last westbound trip of the night now departing Union Station at 11p.m. Departure times have changed, so riders should check the UP website for the latest schedule information.

Two Lakeshore West trains each way for Sunday’s game
While train service is generally increasing on Lakeshore West, construction on Sunday, April 10 will result in GO buses replacing most trains.

Two trips in each direction will be provided for Jays fans and others headed towards downtown Toronto on Sunday around game time.

Trains headed for Union Station will leave from West Harbour at 10:13 a.m. and Aldershot at 10:55 a.m. – making all stops in between – arriving at 11:30 a.m. and noon respectively.

Afterwards, trains will depart Union Station at 4:45 p.m. and 5:15 p.m., reaching West Harbour at 6:03 p.m. and 6:33 p.m. (again, making all stops).

Burlington fans waiting to board a GO train on the way to a Jays game.

Lakeshore West customers planning to travel on Sunday at other times can find information about replacement buses here.

For those who haven’t been on GO Transit for a while, here are a few quick updates:

A weekend day pass for unlimited travel is available for only $10. The weekend pass is just $5 more.

At Union Station, the revitalized Bay Concourse offers more eating and retail options.

The new Union Station Bus Terminal is open, just south of the old terminal.

You will see seat belts on the newest GO buses. Please buckle up when seat belts are available – it’s the law.

 

 

Return to the Front page

An Old Timer gets a message from a member of the family - it doesn't get better than this.

By Staff

April 4th, 2022

BURLINGTON, ON

 

We don’t have a picture of the day section.

But we do get really heart-warming pictures pretty regularly.

This one had to be shared.

The picture was taken by Scot Cameron – an Old timer as well as a photographer.

It is of the Grey division Champions of the Burlington Oldtimers Hockey Club

Share it widely.

Return to the Front page

Waterfront Planning Study Completed: here is what they are recommending and why. On the Tuesday Council agenda

By Pepper Parr

April 4th, 2022

BURLINGTON, ON

 

A report that was going to need a couple of months to be completed by the consultant the city had hired was given a big push and – on Tuesday Council will be asked to receive the report and endorse the recommendation from The Planning Partnership

The Appendix A part of the 245 page document is where the meat on the bone is set out. We will publish that as a seperate article.

The 400 page addendum to the Standing Committee will be debated on Tuesday. – virtually

The white dotted line is the study area. The elephant in the room is the waterfront hotel site. What gets put on that property impact everything else.

Receive the “Waterfront Hotel Planning Study Planning Justification Report” dated March 23, 2022, prepared by The Planning Partnership Limited, E

Endorse in principle the Waterfront Hotel Planning Study, the recommended Preferred Concept Plan, site-specific draft Official Plan policies, directions for a future Zoning By- law amendment and site-specific Urban Design Guidelines as detailed in Appendix “A” to community planning department report PL-28-22; and

Consider the Waterfront Hotel Planning Study findings in Council’s consideration of the site-specific development applications for 2020 Lakeshore Road.

The consultants are saying – no more public engagement – we have heard all we need to hear – let’s just get on with it – or words to that effect.

The Mayor and Councillor Lisa Kearns bought into the Plan B objectives and became champions for it.

The Plan B people put a lot of pressure on the ward Councillor Lisa Kearns and the Mayor – those two bought into what Plan B was advocating, championed that point of view and ipso facto ( an inevitable result) a report comes popping out.

The city needed to close this poorly handled stage of downtown development.

What is particularly concerning is that the continued failures on the part of the Planning department took place when we had a Mayor who was going to bring some order to the way developments were handled.

One paragraph in the report, as dismal as it is, reflects what has been going on. It reads: Subsequently, the Waterfront Hotel Planning Study was placed on hold due to other various priorities in the Community Planning Department such as the new Official Plan process.

The decision came from the City Manager and Council went along with it.  No one asked what the down side risk was. We now know what that risk is.

One Councillor who didn’t want to be quoted said to me during a conversation: “What Vision” – this city doesn’t have a vision.

The PIER went trough its trial and tribulations. The city ended up with a tower that did nothing other than add to the price. It was supposed to house a wind turbine that would pay for the electricity used.

The building of The Pier went through a similar tortuous process. In that situation the city paid for The Pier twice and went through one of the biggest collection of insurance law suits this city has ever seen.

The purpose of the study was to provide a land use and urban design framework to inform site-specific policies to guide a future redevelopment of the Subject Site.

The quaint small village feel is hard to experience as you walk by the six level podium that has been proposed.

The problem with that approach was that the city took so long to get the study completed that the owner of the Waterfront Hotel got tired of waiting and filed a development application that will plunk two 40+ towers at the bottom of Brant Street and crowd the sidewalk of Lakeshore with the kind of structure you find on Bloor Street in Toronto.

The time line the city was faced with was a treacherous path. When the Community Planning, Regulation and Mobility Committee iinformed Council on January 11, 2022, that the anticipated timeline to complete the study was 16-17 weeks a wave of indigestion must have hit the tummies of every member of council. They came back with a Staff Direction:

They did it virtually – made sure that the Waterfront Study was going to be completed in time. Out went the 16 – 18 week. They had a couple of weeks to deliver.

Direct the Director of Community Planning to complete the Waterfront Hotel Study within the statutory time frame of processing the pending application related to the Waterfront Hotel (2020 Lakeshore Road) so as to inform the review of any development proposal on this site in accordance with the policies of the Official Plan.

The time frame was this: The developer had the right to appeal to the Ontario Land Tribunal for a decision because the city did not respond within the allotted 120days – in order to avoid such an appeal the city had to complete their review of the application before April 17th.
The city Planning department “refusal” report is to be heard at Council on the 12th.

An overview of the Study findings is summarized below:

This is the concept the consultants working on the Waterfront Hotel Study are putting forward based on the work they have been doing since 2017. The question is – Is this the best the city can do? And does it comply with the vision.

The recommended preferred concept (2022): 

has regard for matters of Provincial Interest, policy and legislation and has been designed with consideration for the intent of the applicable Regional and Local Municipal policies and guidelines;

reflects overall alignment with City’s in-force Official Plan (1997), the new Official Plan (2020), ROPA 48 and emerging context within the Study Area;

delivers a vibrant mix of uses that will reinforce and support the continuing evolution of the Downtown;

provides for a compact built form that is transit supportive, provides for a range of housing, supports intensification and provides for a range of uses

enhances the streetscape along Lakeshore Road unified with a common language of materials and design elements;

provides for public view corridors down Brant and John Streets to Lake Ontario;

provides for on-site parkland dedication to enhance public access to Spencer Smith Park and build upon an important landmark through high quality open space;

Proposed urban design guidelines will provide site-specific guidance related to the conditions and context of the site to implement the Vision and Principles established through the consultation process and subsequently endorsed in principle by Council in early 2018;

An Official Plan Amendment (OPA) to the in-force OP is required to implement the findings of this Study, and include site specific directions related to matters such as massing and scale, transportation and public open spaces; and,

A Zoning By-law Amendment (ZBA) will be required to implement the OPA. The Study recommends that a rezoning process take place in the future to consider the Preferred Concept (2022) and would also be supported by detailed technical studies.

The following sections of this report summarizes the recommended preferred concept and implementation tools.

The recommended preferred concept is based on the inputs and work completed in 2017 and 2018, feedback on the emerging preferred concept (2022) and consideration for the relevant policy drivers and changes since the Study paused in mid-2018. Section 6.0 of the Planning Justification Report (see Appendix “A”) provides a comprehensive overview of the preferred concept plan.

Highlights of the Recommended Preferred Concept/ Highlights of the preferred concept include:

Land Use / Built Form

• Building heights: 21 storeys for the west tower and 22 storeys for the east tower
• John Street public view corridor with a minimum width of 18 metres
• Stepping down of built form toward Lake Ontario
• 3-storey podium/street wall along Lakeshore Road
• Active at-grade uses like commercial, retail and restaurants
• Focus on a strong pedestrian relationship to the streets and public spaces

Public Realm

• Enhance Brant Street as a gateway to the Downtown, the Waterfront and the Waterfront Trail
• Enhance the entrance to Spencer Smith Park and the Brant Street public view corridor
• Additional public parkland identified on the west and south sides of the Subject Site:
o West side: 0.13 ha
o South side: 0.05 ha
o Total: 0.18 ha
• Provide a John Street public view corridor and inclusion of a privately-owned public space (POPS)
• Maintain existing trees along Lakeshore Road

Mobility and Access

• Remove existing vehicular access at the foot of Brant Street
• Site access for parking and loading from Elizabeth Street
• Active Transportation route along Lakeshore Road, including a painted buffered bike lane as identified in the City’s Cycling Master Plan
• No surface parking on site

Future Zoning By-law Amendment

A Zoning By-law Amendment (ZBA) will be required to implement the OPA. The Study recommends that a rezoning process take place in the future to consider the Preferred Concept. Furthermore, the Study provides that:

“A future rezoning process, supported by technical studies and further evaluation, would allow for flexibility to achieve an interesting built form that would better respond to the landmark nature of this site. This ZBA process would take place in the future and would advance additional engagement through the statutory public process. It would allow for the principles of this Study to be further advanced and explored through meaningful active engagement with the public and stakeholders of this project. Furthermore, a rezoning in the future would allow for community benefits to be leveraged through Section 37.” (or in accordance with alternative benefit charges).

Site-Specific Urban Design Guidelines

The Study recommends site-specific urban design guidelines that will apply to the development of the Subject Site.

When the two towers are in place the pressure to allow higher intensification on this part of Brant that is a two walk away in distance will be tremendous. The two towers remake the downtown – which is fine – if that it what you want.

The intent of the site-specific urban design guidelines is to augment and enhance the City existing urban design documents by providing site-specific guidance related to the conditions and context of the site. They will work together with the guidance provided in the City’s design documents to implement the Vision and Principles established through the Study’s consultation process phase and subsequently endorsed in principle by Council in June 2018.

The site-specific urban design guidelines are provided in Section 6.3 of the Study (Appendix “A”).
The recommended site-specific urban design guidelines provide guidance with regards to:

• Built Form (Building Placement; Building Height, Massing and Transition; Tower Separation; Podium Height; and Setbacks / Stepbacks);

• Access and Mobility; and

• Public Realm (John Street View Corridor; Spencer Smith Park; Lakeshore Road; and Elizabeth Street).

Staff Position on The Study’s Recommendations

Staff are supportive of the recommendations as outlined in the Study

Delivers a vibrant mix of uses that will reinforce and support the continuing evolution of the Downtown;

• Has regard for matters of Provincial, Regional and Local Municipal policies and guidelines;

• Includes tall mixed-use buildings with commercial uses at grade, and residential and/or hotel uses which address many Provincial, Regional objectives and aligns with the overall directions established by ROPA 48;

• Achieves the City’s vision as articulated in the in-force OP (1997) and considers the policy direction of the new OP (2020);

• Provides residents and jobs and public open spaces in this central location that will further support the creation of a complete community; and,

• Creates a special place by balancing significant new redevelopment with public amenities and accessible open spaces.

It is staff’s opinion the completion of the Study has been fulfilled with the delivery of The Planning Partnership’s Planning Justification Report.

Return to the Front page

City seeks six local artists for small public art projects

By Staff

April 4th, 2022

BURLINGTON, ON

 

Plains Road at Waterdown Road

The public art program is once again opening submissions for its annual Local Artist Program. The program commissions local artists to create a variety of small to medium scale artworks throughout the community. The City is inviting local artists to submit their design ideas that will be installed on traffic control signal boxes throughout the city later this year. Six artists will be commissioned to create a unique design that will be used to produce the utility box vinyl wraps.

This is a design only commission as the City of Burlington will be responsible for the fabrication and installation of the vinyl wraps. Burlington artists may create a new artwork concept for this project or reformat an existing artwork. Successful artists will be required to submit a high-resolution digital file of their artwork concept (assistance is available upon request).

Applicants must be a resident of Burlington, Ont.

For deadlines and more information on how to get application help and/or apply, please visit www.burlington.ca/publicart.

 

Timeline:

Deadline Activity
April 4 to 29 Application assistance available upon request
May 13 Application deadline
By June 3 Successful artists selected; enter into a contract with the City of Burlington.
June through July Project development: Artists work with Public Art staff to refine designs, finalize artwork concept and create digital artwork file.
August Installation and online project launch (date TBD)

Regal Road Bridge

 

Artwork Locations

Location Nearby Landmarks
New Street & Shoreacres Road Nelson Recreation Centre
New Street & Appleby Line Appleby Square
Lakeshore Road Joseph Brant Hospital (parking garage entrance)
Prospect Street & Pearson Street Tom Thomson Public School
Upper Middle Road & Cavendish Drive Near Kingsbridge Court
Walkers Line & Thomas Alton Boulevard Alton Village

 

Return to the Front page

Condo buyers are bumping into the realities of the real estate market - or is it a new level of greed asks an unhappy customer

By Pepper Parr

April 4th, 2022

BURLINGTON, ON

 

 

Prices for detached single family houses have soared during the past year.  Homes have sold for 49% above the asking.

The folks in the condo market are now experiencing the same problem – with the difference being that  people who paid deposits are now finding the price of the condo they have yet to take possession of has gone up

Construction delays and price increases, according to the developers, are the problem in the condo world theses days.

The Gallery, a 26 storey tower currently under construction across the street from city hall is behind schedule.

Folks who have purchased in the Carnicelli Gallery going up opposite city hall have been told that it will be something in the order of eight to ten months more before they can call the moving van.  They had expected to move in sometime in November

A couple of blocks to the west people who have purchased in the Nautique have been told that the original deal isn’t on anymore,.

The ADI Group development determined that construction costs make it impossible for them to build at the original selling price.

The Nautique has been plagued with problems from the day they filed their application to build. Readers of the Gazette have followed this amazing story.

People who had sales agreements will have their money returned and be paid interest on the deposit or they can pony up an additional 50 to 60% and wait until the building is ready for occupancy.

One Gazette reader said there was a weasel clause in the sales contract that let ADI take the action they took.

ADI has access to exceptional legal talent – buyers are going to have to retain smart talent of their own.  The lawyer on the client side should have seen the clause in the agreement and advised their client as to what was possible.

Glenn Gillespie, an about to retire fire fighter expected be in the unit be bought in 2015.

The unit he purchased for $508 thousand dollars seven years ago is going to require an additional $300,000  if he want to take ownership when the construction is complete.

Gillespie said he had a choice: either pay the extra money for a condo that doesn’t exist yet or get his $126,000 deposit back with 6 percent interest and give up his unit.

Gillespie told CHCH news that “he thinks the developers want the owners to take their money and leave so that they can charge a higher price for the condos. He contacted a lawyer who says 14 other owners from the same building are also reviewing their legal options.”

 

 

 

Return to the Front page

Did Metrolinx once have grand ideas for the Burlington GO station parking lot?

By Pepper Parr

April, 4th, 2022

BURLINGTON, ON

 

A first look at the rendering below leads to the questions:  Isn’t that the Burlington GO parking lot?

It is and at one point Metrolinx had evaluations one on all their properties to determine what their development options were.

We don’t believe this is part of the current Metrolinx thinking.  It will be interesting to learn when they were doing the thinking and what happened once the values had been determined.

There are a lot of high rise structures on the property.

Was this before intensification was dropped on Burlington?

 

No date on when rendering was done. We will chase that down.

 

Return to the Front page

Nelson Youth Centres (NYC) merges with ROCK

By Staff

April 3rd,  2022

BURLINGTON, ON

 

Nelson Youth Centres (NYC) and ROCK Reach Out Centre for Kids are now one agency – the merger was effective April 1st.

The merger will improve mental health service efficiencies for children, youth, and families in Halton Region.

ROCK will maintain the Nelson Youth Centres’ name for continued programming and ensure the legacy lives on. We honor all those that have been a part of this journey with Nelson Youth Centres over the past 44 years.

All services for both ROCK and NYC will continue to be accessed through our Halton Child and Youth Mental Health Access and System Navigation.

A lot more to this story – we will follow up.

Return to the Front page

Virtual Panel About Mental Health and Addictions - April 6th

By Staff

April 2nd, 2022

BURLINGTON, ON

 

Joseph Brant Hospital (JBH) will be holding a virtual panel about mental health and addictions to shine a light on this important topic, help people discover the available services in the community and provide a forum for questions and answers at a time when many are looking for more support.

Wednesday, April 6, 2022, 7 to 8 p.m.

 Via Zoom – Link to Zoom webinar:

https://www.josephbranthospital.ca/en/programs-and-services/mental-health.asp

Taking part in the event are:

Moderator: Natalia Kusendova, MPP for Mississauga Central and Registered Nurse

Steve Selchen, Chief of Psychiatry, Medical Director, MHA (JBH)

Monidipa Ravi, Child and Adolescent Lead Psychiatrist (JBH)

Michelle Barr, Director of Services, Reach Out Centre for Kids (ROCK)

The need for mental health and addictions services has grown throughout the pandemic. One-third of Canadians aged 15 or older who reported having a need for mental health and addictions care said those needs were not fully met. By age 40, about 50% of the population will have or have had a mental illness. JBH provides mental health and addictions programs and services for adults, children and adolescents.

 

 

Return to the Front page

High End Car Theft Ring Nabbed - all held for a bail hearing.

By Staff

April 1st, 2022

BURLINGTON, ON

 

Investigators from the Halton Regional Police Service – 1 District Criminal Investigations Bureau and Toronto Police Major Crime were involved in a month long multi-jurisdictional investigation dubbed “Project Raptor” resulting in the recovery of 20 stolen vehicles worth over $1.5 million. Four suspects were arrested as a result of their involvement in this organized auto theft ring.

Tools of the trade for high end car thieves.

It is alleged the suspects would gain entry to the vehicle through force allowing them access to the vehicle’s ‘On Board Diagnostic Port’ (OBD).  From there, the suspects utilized key programming devices to program a new key fob.  The thefts occurred across Halton, Peel and Toronto.

The vehicles targeted were newer model Jeeps and Ford F-150s.   It is believed that these vehicles were slated to be loaded into shipping containers to export them overseas to Middle Eastern countries.

On March 29, 2022 investigators arrested four persons involved in this auto theft ring and subsequently executed two residential search warrants.  Investigators seized several key fobs and electronic devices used to access the on-board diagnostics (see attached photo).

The following persons were arrested and charged:

Bawa Singh, (22) of Brampton has been charged with:

  • Theft of Motor Vehicle (10 counts)
  • Mischief Under $5000 (4 counts)
  • Breach of Recognizance (9 counts)
  • Possession of Auto Master Key
  • Possession of Property Obtained by Crime Over $5000

Nitin Gagneja, (21) of Brampton has been charged with:

  • Theft of Motor Vehicle (10 counts)
  • Possession of Break and Enter Tools (2 counts)
  • Mischief Under $5000 (4 counts)
  • Possession of Auto Master Key (3 counts)
  • Possession of Property Obtained by Crime Over $5000

Abu-Bakar Sheikh, (22) of Brampton has been charged with:

  • Theft of Motor Vehicle (9 counts)
  • Mischief Under $5000 (4 counts)
  • Breach of Recognizance (9 counts)
  • Possession of Auto Master Key

Attiq Ur Rehman, (22) of Mississauga has been charged with:

  • Theft of Motor Vehicle (4 counts)
  • Mischief Under $5000 (2 counts)
  • Breach of Recognizance (4 counts)
  • Possession of Auto Master Key

All accused were held in custody pending a bail hearing.

Anyone with information regarding this investigation is asked to contact Detective Phil Vandenbeukel of the 1 District Criminal Investigations Bureau at 905-825-4747 ext. 3407.

Tips can also be submitted anonymously to Crime Stoppers. “See something? Hear something? Know something? Contact Crime Stoppers” at 1-800-222-8477 (TIPS) or through the web at www.haltoncrimestoppers.ca.

Police would like to remind residents of the following tips to help protect against these types of thefts:

  • Park your vehicle in a locked/secure garage, if possible.
  • Lock the onboard diagnostic port using a simple device (that can be purchased online) that blocks access to where thieves reprogram the vehicle’s key fob
  • Use a steering wheel locking device to deter theft
  • Invest in an aftermarket global positioning system (GPS) tracker as it may assist in recovery of the vehicle if it is stolen
  • When not in use, place vehicle key fob inside a radio frequency shielding bag/pouch to block cell signals
  • Consider purchasing a quality video surveillance system and ensure your cameras are properly placed and functioning for 24-hour use

 

 

Return to the Front page

A Look at some of the ideas that were put together as the consultants tried to figure out what the public wanted.

By Pepper Parr

March 31st, 2022

BURLINGTON, ON

There is a consulting group that operates under the name of The Planning Partnership.

Thy were hired by the city to take part in the study of the Waterfront Hotel site that everyone knew was going to be developed at some point.

The city began this work in 2015 when staffer Jodi Wellings was tasked with putting together some of the early thinking.

At that time the plan was to have whatever was built om the site face west and give a view of the Naval Promenade.

Among the decisions that came out of the early part of the study was the agreement that there would be a detailed study that the develop would par for but that the city would control.

The Waterfront Study got put on hold in 2018 because the Interim Control Bylaw that had been imposed and the issues related to the re-writing of the new Official Plan – call it the Meed Ward version for clarity – were taking up most of the capacity at city hall.  The deep thinking planners appear to have concluded that they had all kinds of time and that the developer would wait until the study was completed..

That decision has resulted in the developer deciding to proceed on his own with a development application that stunned a lot of people when it was first released.

The city should have seen that coming. Darko Vranich is a very strategic thinker – he saw an opportunity and went for it.

The Planning Partnership released their final report (240 pages plus) and offered their Preferred Concept that will get xxx

While holding the many public engagement events all kinds of ideas came to the surface and were set out in different reports.

Set out below are some of the drawings that reflected what kind of thinking was being done.

Then there was a couple of truly brutal designs.

 

Another that looked something like the stretch of building built on the south side of the Gardner Expressway in Toronto almost  obliterating any view of the lake

 

Are their options for the city to get out of a situation they created by not staying on top of a critical file ?  There was a point where the city did not have a planner assigned to the file.

We have an interesting month ahead of us.

Related news stories:

The man behind the development plans

Plan B has made a difference – have they gone far enough>

Return to the Front page

Bring us your frazzled hair drier, that printer that won't print or the kettle that doesn't boil anymore - it could be fixed free

 

By Pepper Parr

March 31st, 2022

BURLINGTON, ON

 

The next Repair Cafe will take place on Saturday,  April 9th from 10am to 2pm at Port Nelson United Church, 3132 South Drive.

The Repair Cafe has been helping people salvage appliances that stopped working.  Rather than throw them out and go looking for another ne – they take them to the Repair Cafe where they are fixed, if it is possible to fix them.

They have been doing this in an on and off sort of way for four years

What it fixed – t=did the owner leave a happy camper. We weren’t told Photo credit: Shelly Cameron

Their first Repair Cafe was held at the Rolling Horse Community Cycle shop on Plains Road E. in the Spring of 2019.  We have held seven Repair Cafes since.  Later in the year they will be at Burlington Centre

Their plans are to be at Outdoor Markets hosted by the Aldershot BIA in June, July, August.  Beyond that, we hope to hold one Repair Cafe per month at various locations around the city, to be more accessible to all corners of the community.

Having a stable source of funding from the City’s Community Development Fund, allowed us to become more organized, and to be able to plan a year ahead.  Funding goes towards rent, liability insurance, purchase of parts and tools, and other expenses.  The funding ends in December, 2022.  Beyond that we will have to rely on individual donations and, perhaps, sponsorship from the community.

They are a 100% volunteer-run.  They do not charge for repairs – this being a community service.  If they don’t have a specific or unique part on hand, we offer the resident the option of ordering the part themselves and bringing their item to the next Repair Cafe, or, we order the part with the understanding that this cost will be reimbursed by the resident. We fix items on the spot and do not take items home to be repaired.  These operational methods are defined by the international network of Repair Cafes, and we are happy to comply.

 

 

 

Return to the Front page

Here is what the consultants working for the city suggest as the preferred concept. Can we do better than this?

By Pepper Parr

March 31st, 2022

BURLINGTON, ON

 

All kinds of activity on the waterfront.

The Waterfront Hotel Planning Study released their Preferred Concept for the site.

The city Planning department has announced that they are not approving the application that was submitted to the city.

Their report will be covered in a separate article.

Right now we want to show you want that Waterfront Study concept looks like.

In this concept the city did manage to get a 20 metre strip of land to add to Spencer Smith Park.

 

The structures as rendered are pretty brutal looking.

Return to the Front page

Arrest Made After Two Attempted Robberies in Burlington

By Staff

March 31st, 2022

BURLINGTON, ON

 

The Halton Regional Police Service (HRPS) has made an arrest in relation to two attempted robberies that occurred in Burlington.

On March 30, 2022, at approximately 9:30 am, a female suspect attended the drive-thru of the Wendy’s located at 2387 Fairview Street in Burlington. The suspect demanded cash from an employee and indicated she had a gun. No gun was observed. The suspect drove away from the scene without receiving any funds.

At approximately 10:00 am the same day, the suspect attended Spry Convenience located at 2164 Mountain Grove Avenue in Burlington. She approached an employee inside the store and demanded cash. The suspect again indicated she had a gun, although no gun was observed. The suspect left the store a short time later without receiving any funds.

In both incidents, the suspect was observed to be driving a 2022 Dodge Ram pickup truck which had been reported stolen from Hamilton earlier in the day.

No physical injuries were sustained as a result of either attempted robbery.

As a result of the investigation, officers were able to identify the suspect. She was arrested in Toronto shortly after 1:00 pm. The stolen vehicle was also recovered in Toronto.

Sophia Voortman (19) of Hamilton has been charged with:

  • Robbery (2 counts)
  • Possession of Property Obtained by Crime
  • Theft Under $5000
  • Fail to Comply with Release Order (2 counts)

Voortman has been held in custody pending a bail hearing.

Anyone with information regarding this investigation is asked to contact the 3 District Criminal Investigations Bureau at 905-825-4777 ext. 2316.

Tips can also be submitted anonymously to Crime Stoppers. “See something? Hear something? Know something? Contact Crime Stoppers” at 1-800-222-8477 (TIPS) or through the web at www.haltoncrimestoppers.ca.

 

Return to the Front page